Asset-based Seattle/Tacoma port trucking, rail drayage, yard storage and container support. (206) 802-5203 · info@splogisticsllc.com
Container lane

BNSF to Sumner Rail Drayage

Confirm the correct BNSF ramp, release and chassis status, Sumner receiver timing, and whether confirmed-scope palletized support is actually needed.

BNSF release and Sumner appointment

Send the named BNSF ramp, release, chassis, Sumner receiver, unload method, and any confirmed palletized work.

BNSF pickup

Confirm the BNSF rail release and interchange instructions for the Sumner schedule, plus the container, weight, chassis, and equipment.

Sumner receiver

Provide the exact Sumner address, appointment, site contact, access notes, live-unload or drop method, and expected time on site.

Closeout after Sumner

After delivery in Sumner, identify the empty or equipment return, chassis return, driver-hour implications, staging if needed, and the contact responsible for final release.

BNSF release, Sumner delivery, and any palletized work must be separated

Name BNSF SIG or the applicable BNSF Seattle facility and send the release, unit, interchange terms, chassis or equipment need, weight, and pickup window. The Sumner receiver should provide appointment, access, unload method, service time, and closeout instructions.

Any palletized loading, unloading, or storage request requires a separately confirmed scope with the Sumner partner warehouse. It is not included with rail drayage, and the rail-equipment or chassis return still needs its own instructions.

BNSF pickup and Sumner receiver

Use BNSF SIG support when that facility applies and rail drayage for receiver timing, equipment, and return.

Price the Sumner rail delivery

Send the BNSF ramp and release, Sumner appointment, chassis details, unload instructions, and equipment closeout.