Container equipment guide
What is a genset for a reefer container?
A genset supplies power to a refrigerated container when a fixed connection is unavailable. Plan equipment fit, fuel, instructions and each receiving handoff.
By SP Logistics · Reviewed
A genset supplies electrical power to the reefer unit
A genset is a generator set that supplies electrical power. A refrigerated container has its own refrigeration machinery; the genset can power that machinery during road transport or another agreed interval without a fixed electrical connection. The generator and refrigeration unit therefore have different jobs.
The container’s powered journey needs to be planned from pickup to handoff. The equipment source, fuel, installation or connection arrangement and responsibilities should be clear before the truck is scheduled.
Confirm the configuration and supplying party
Container gensets may be supplied in clip-on or chassis-mounted configurations. The selected unit must suit the container, chassis and transport arrangement. Share the container size, refrigeration equipment details when available, pickup facility and the supplying party’s instruction.
Do not infer fuel endurance or equipment availability from another shipment. Include the planned powered time, any staging and the receiving appointment so the provider and transport team can agree the required arrangement.
Follow power through the complete movement
| Stage | Confirm before dispatch |
|---|---|
| Terminal or rail pickup | The container, release, cargo instructions and the equipment that will supply road power. |
| Truck and any agreed stay | Expected duration, fueling responsibility, location and requested checks or logs. |
| Receiver or cold store | Appointment, power during receiving, handling party and the next equipment responsibility. |
A generator running is not the same record as a verified product temperature. Tell the team what settings, checks and records the cargo owner requires, who reviews them and who should be contacted if a problem is reported.
Use the cargo owner’s temperature and handling instructions
Provide the required setting and unit, commodity, ventilation or handling requirements and any transport paperwork. For food shipments, agree the relevant sanitary and temperature responsibilities among the shipper, carrier, loader and receiver. A website guide cannot select one temperature for different products.
SP can review genset sourcing, fueling arrangements and scheduled manual checks as part of the shipment proposal. Continuous remote monitoring is not assumed. Unloading or cold storage is arranged through a suitable regional handling partner when needed.
If a power interruption or alarm is reported
Agree the reporting contacts before pickup, including the cargo owner, equipment provider and any out-of-hours contact for a scheduled move. An alarm, a power interruption and a missing data update are different reports; a data gap alone does not prove the unit has stopped.
- Record what is known. Note the time and time zone, container and equipment identifiers, location, power status, alarm code and available readings. Keep the required setpoint separate from the observed readings.
- Notify the agreed contacts. Share the facts with SP and the named cargo or equipment contact. Follow the authorized instructions for equipment assistance, power restoration and the next receiving handoff.
- Keep the record through receiving. Record the actions and times, then pass the information to the receiving team. A restart or an air-temperature display alone does not establish the condition of the product.
Do not change the cargo owner’s setpoint to compensate for an alarm. Any assessment or disposition of affected cargo belongs with the authorized cargo and receiving parties.
For food transport covered by FDA’s rule, a possible material temperature-control failure or another condition that could make food unsafe requires keeping it from sale or distribution until a qualified individual determines it was not made unsafe.
Operating references: Reefer power and temperature readings · FDA food transportation requirements · FDA’s transport FAQ.
Send a request the equipment team can use
- Container size, equipment type, commodity and the cargo owner’s instructions.
- Named pickup facility, release and expected powered time.
- Genset source, connection arrangement, fuel and requested check/record responsibilities.
- Receiving appointment, any staging or cold-storage work and equipment return.
This planning guide was reviewed November 17, 2026. Confirm the equipment provider’s current instructions and the agreed cargo, power and receiving arrangements for the shipment.