Import delivery planning

Plan import container delivery from pickup to empty return

Prepare a Seattle or Tacoma import delivery with a practical release, last-free-day, receiver, chassis and empty-return checklist, plus a sample shipment request.

By SP Logistics · Reviewed

Arrival, release and availability answer different questions.

Import container delivery is the truck movement from the terminal or rail ramp to the receiving site, followed by the agreed equipment collection and return. The useful question is not only when the ship arrives: it is when this container can be collected and when your receiver can accept it.

Four checks before an import pickup is scheduled
CheckWhat to establishWho to contact for an open item
Release and holdsThe responsible parties have authorized pickup and any shipment holds are resolved.Your forwarder, customs broker, ocean carrier or other party controlling the release.
Physical availabilityThe container is available for the truck transaction at the named facility.The terminal or railroad’s current unit information.
Last free dayThe applicable last free day and the instructions used to confirm it.The terminal or party applying the relevant free-time terms.
Receiver appointmentA real receiving slot, usable entrance and agreed unloading method.The warehouse or receiving team.

A planned arrival date, a release document and an appointment are useful inputs, but none substitutes for the other checks. If one is still open, identify the person resolving it instead of treating the move as ready. Do not send passwords or account access details in a quote request.

Decide how the receiver will unload.

Confirm the dock, labor, handling equipment and expected time at the site. For a live unload, the truck stays for the agreed handling period. For a drop, the site must accept the equipment and provide an empty-ready notice for the later collection.

Tell dispatch about gate codes through the agreed operational channel, truck restrictions, overhead clearance, turning space and appointment contacts. For repeat containers, add receiving slots per day and expected containers per week.

Compare live unload, container drops and immediate exchanges.

What if the warehouse cannot receive before the last free day?

Compare direct delivery with a pre-pull into a suitable staging arrangement. A pre-pull can separate terminal pickup from the receiving date, but it adds a yard handoff, equipment time and another truck movement. It does not automatically stop every charge applying to the container or chassis.

Planning example: a container is available before the warehouse’s first appointment. Ask for a plan covering terminal pickup, Tacoma staging, the yard stay, chassis use, delivery and the empty return. Compare that complete scope with the alternative of leaving the container at the terminal. The release, cargo suitability, current charges and available yard/equipment determine the workable choice.

Use the pre-pull planning tool or explore Tacoma staging.

Plan the empty return before unloading starts.

Record who tells dispatch the container is empty, which container return instruction applies, whether an appointment is needed and where the chassis goes. Container and chassis providers can have different return locations and time rules. Recheck current acceptance before the collection is dispatched.

Keep the pickup, delivery and return records together. SP confirms pickup, delivery and empty return for the work handled, with proof of delivery and applicable equipment interchange receipts. If a return is rejected or the instruction changes, record the reason and contact the responsible party for the next authorized step.

Prepare the empty-return plan.

A practical import request to send to the carrier.

  • Pickup: exact terminal or rail ramp; container number and ocean carrier or equipment provider.
  • Equipment: 20FT, 40FT, 40FTHC or 45FT; cargo, gross weight and chassis source if known.
  • Timing: release/hold status, availability, last free day and where it was confirmed.
  • Delivery: address or city, receiving appointment, entrance, contact and live-unload or drop arrangement.
  • Return: empty-ready contact, current container/chassis return instruction and any known deadline.
  • Open items: what is missing, who is resolving it and whether this is one container or recurring volume.

You can request an initial review before every field is complete. Mark unknown items clearly so the proposal can identify what still needs confirmation. A 53-foot trailer or intermodal unit uses its own 53FT Power Only Support path.