Specialized
Reefer and genset drayage: details dispatch needs before review
Assign reefer power and fuel responsibilities
- Temperature setting, commodity sensitivity, and required documentation from the responsible party.
- Genset source, fuel expectations, and power responsibility.
- Terminal or ramp, pickup timing, receiver appointment, and unload plan.
- Storage, staging, or yard timing question if applicable.
Assign temperature, power, and fuel responsibilities
Reefer moves need clearer equipment and timing details than a dry container. Temperature requirements, genset source, fuel expectations, and receiver timing affect dispatch review.
Reefer power, fuel, and closeout checks
- Reefer and genset equipment are available for the requested timing.
- Power, fuel, temperature, and monitoring responsibilities are assigned.
- Receiver appointment and unload timing are workable.
- Any Tacoma yard or plug-in request is separately arranged.
Reefer drayage SP Logistics can review
Dispatch confirms the genset source, power and fuel responsibilities, receiver timing, and any separately arranged plug-in need before accepting reefer work.
Send the reefer, genset, and temperature instructions
Send the temperature setting, genset source, fuel responsibility, pickup timing, receiver appointment, and return plan.