Asset-based Seattle/Tacoma port trucking, rail drayage, yard storage and container support. (206) 802-5203 · info@splogisticsllc.com
Specialized

Reefer and genset drayage: details dispatch needs before review

Assign reefer power and fuel responsibilities

  • Temperature setting, commodity sensitivity, and required documentation from the responsible party.
  • Genset source, fuel expectations, and power responsibility.
  • Terminal or ramp, pickup timing, receiver appointment, and unload plan.
  • Storage, staging, or yard timing question if applicable.

Assign temperature, power, and fuel responsibilities

Reefer moves need clearer equipment and timing details than a dry container. Temperature requirements, genset source, fuel expectations, and receiver timing affect dispatch review.

Reefer power, fuel, and closeout checks

  • Reefer and genset equipment are available for the requested timing.
  • Power, fuel, temperature, and monitoring responsibilities are assigned.
  • Receiver appointment and unload timing are workable.
  • Any Tacoma yard or plug-in request is separately arranged.

Reefer drayage SP Logistics can review

Dispatch confirms the genset source, power and fuel responsibilities, receiver timing, and any separately arranged plug-in need before accepting reefer work.

Send the reefer, genset, and temperature instructions

Send the temperature setting, genset source, fuel responsibility, pickup timing, receiver appointment, and return plan.

Reefer equipment and timing support

Use these links after temperature, genset source, fuel responsibility, pickup timing, receiver appointment, and return are assigned.